ex-documents
The creation of explosion protection documents can be larger or smaller depending on the system (image on the right: example of a large system).
The explosion protection document must be kept up to date. It must be created before commissioning.
According to the new GefStoffV, it is part of the risk assessment. Hazardous explosive mixtures must be specially identified (§ 6 Para. 9 GefStoffV).
It must be drawn up in accordance with the requirements of § 6 GefStoffV and is mandatory for the operator of the system.
All further safety measures and instructions will take place on this basis - therefore no mistakes must be made here.
Let us advise you on the creation or renewal of your explosion protection documents!
In addition to the general section and the plant-specific section, we create the following content:
Risk assessment including the measures implemented
Zone classification
Definition and implementation of measures for potentially explosive atmospheres in the risk assessment
- Information on instructions
- Information on maintenance measures
- Information on the coordination of safety measures
- Information on the inspection concept



